FIVE ENERGY FROM WASTE (EfW) INCINERATORS, the plants already in the planning system when Scotland introduced its 2022 moratorium, are built, under construction or still advancing through planning – a number that runs as high as ten once looser counts of the wider pipeline are included. Not one carries carbon capture, and no operator is […]